久久一二三四,韩国日本在线,激情天天 Installing Grafoil Crinkle Gasket Tape

自拍97-香蕉久久国产av一区二区-日韩欧美在线观看视频-国产精品无码白浆高潮-亚洲综合成人网-欧美第五页-91在线小视频-五月婷婷丁香综合-亚洲美女啪啪-欧美视频一二三区-av东方在线-黄色小说在线观看视频-亚洲精品日韩精品-国产精品正在播放-性一级视频-国产午夜精品久久-国模二区-免费的污网站-四虎影院一区二区-伊人久综合-北条麻妃在线一区-欧美少妇毛茸茸-夜间福利在线观看-日韩少妇一区二区三区-av网站大全在线-伊人一区二区三区四区-99在线免费视频观看-97视频中文字幕

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installing Grafoil Crinkle Gasket Tape

1. Brush off any rust or foreign particles. Wipe flange surface thoroughly with a rag soaked in acetone or other suitable solvent to remove grease or oil.

2. Insert fingernail between the paper backing strip and the tape and strip the paper back three to six inches. Draw a reference line in flange and press squared off end of tape against it.

3. Now, start laying the tape along the face of the flange, peeling the paper backing as you go. To prevent the adhesive surfaces of the tape from doubling back on themselves and sticking together, strip away only a few inches of paper at a time.

4. When the starting point has been reached, lap the tape not more than 1/16 inch and cut with a sharp blade.

5. If wrinkles appear because of improper installation, the may be rolled out with a length of pipe.

For Multiple Thickness Gasket, Add Steps 6, 7 and 8

6. When the starting point has been reached, do not cut the tape. Roll out the tape already laid down using a short length of smooth pipe to iron out the wrinkles.

7. Now, repeat step 3. Be sure that the top layer is positioned exactly above the first layer before contact is made. Once the adhesive touches the tape, it is impossible to separate the layers without tearing them.

8. Repeat steps 6 and 7, depending on the number of layers of tape to be laid down. Finish with steps 4 and 5.

>>The End>>

浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn